Print this page

First Jet with Italian Finmeccanica-Aeronautics Wing Takes Flight

كانون2/يناير 23, 2016 1316

The first F-35A full wing-set produced by Italy’s Finmeccanica-Aeronautics at the Cameri, Italy, Final Assembly & Check-Out (FACO) facility, made its first flight on U.S. Air Force aircraft AF-88 in Fort Worth, Texas, Jan. 15.

 

AF-88 was flying its first Lockheed Martin company check-out flight and is the 156th F-35 produced to date. Defense Contract Management Agency (DCMA) pilots will conduct their U.S. government check-out flights next, prior to aircraft acceptance and delivery to Nellis AFB, Nevada, for operational test and evaluation there.

The work contracted to Finmeccanica-Aeronautics, a strategic co-supplier of F-35A full wing assemblies, is one of the largest manufacturing projects for the Italian F-35 program, with 835 full wing assemblies planned.

“From the beginning of the program, Italian industry has influenced the aircraft's design and capabilities. Italian-made parts and components are installed in every F-35 produced,” said Jack Crisler, Lockheed Martin Aeronautics Business Development vice president. “Italian industry will support the F-35 for more than 30 years, from production of parts and final assembly of aircraft to replacement parts and regional sustainment work.”

Rate this item
(0 votes)
Last modified on السبت, 23 كانون2/يناير 2016 16:11